WAAC / WA HIGH SCHOOL & MIDDLE SCHOOL PHOTOS
FOLLOW THE PROGRESS OF THE POOL - NOT EXACTLY TIME LAPSE BUT SHOULD GIVE YOU AN IDEA OF ALL THAT
HAS GONE ON!          START AT BOTTOM OF PAGE - ENJOY !
POOL AFTER DEMOLITION COMPLETED !
THIS IS FROM BACK DOOR LOOKING TOWARD WHAT WERE BLEECHERS AND LOCKER ROOMS.
THE HOLES IN WALL GO OUT TO WHERE SAND VOLLEY BALL PIT WAS.
THIS IS PICTURE OF THE 2 NEW LANES ADDED AND AREA DUG OUT FOR THE NEW DECK AREA.
THE BLOCK WALL IN PIT IS NEW STAIRWELL. AND OFF TO RIGHT WILL BE LOCKER ROOMS AND BALCONY!
ON LEFT IS CLOSER LOOK AT BALCONY AND LOCKER ROOM AFTER DEMO.
ON RIGHT IS POOL - LOOKING FROM DEEP END TOWARD SHALLOW EARLY ON AFTER NEW LANES WERE ADDED.
THINGS STARTED TAKING SHAPE - PICTURE ON LEFT IS THE MAIN HALLWAY WITH ALL THE METAL SUPPORT BEEMS INSTALLED.
ON RIGHT THIS IS LOOKING WHERE NEW CENTER HALLWAY GOING UP TO POOL WILL BE LOCATED - BETWEEN LOCKER ROOMS.
START OF BOYS LOCKER ROOM.
NEW CONCESSION STAND - LOCATED AT TOP OF STAIRS GOING TO BLEECHERS.
LOCATED BEHIND BLLECHERS.
ON LEFT - CEMENT IS POURED AND WE HAVE OUR NEW DECK.
ON RIGHT SHOWING FROM BALCONY SIDE WHEN METAL BRACING FOR LOCKER ROOMS WAS ADDED PLUS STAIRWELL OPENING.
ON LEFT - NEW METAL STRUCTURE FOR NEW OFFICE AND TIMING CONTROL CENTER ON TOP.
ON RIGHT - BLEECHERS ARE STARTED AND CEILING STRUCTURE GOING IN.
ON LEFT BATHROOMS IN LOCKER AREA ARE COMING TOGETHER - UNDER LUKE AND ZACH INSPECTION :)  THIS IS GIRLS LOCKER AREA.
ON RIGHT CLOSER TO FINISHED PROJECT - STALLS UP - TOWEL DISPENSERS ETC IN PLACE.  PAINT ADDED !
LOCKERS PUT INTO BOYS LOCKER ROOM - TILE ON FLOOR - PAINT COMPLETED!
BLEECHER PROGRESS - STEPS AND RAILS NEED TO BE ADDED.
PAINT COMPLETED - LIGHT TRACK IS INSTALLED - FRONT WALL NEEDS TILE!
ON LEFT - BLEECHERS COMPLETED - STEPS AND RAILINGS INSTALLED - PAINT ON WALLS AND SOUND BAFFLING UP.(GREY PANELS)
ON RIGHT - SAFTEY  RAIL IS UP - TILE ON POOL WALL IN PLACE - WINDOWS IN OFFICE - TILE ON DECK COMPLETED ! DRY ERASE BOARD UP !
BASE LINER AND tS GOING IN POOL - PROGRESS !
ON LEFT LOOKING FROM WHERE OUR TIMING CONTROLS WILL BE.  ON RIGHT FROM ENTRANCE TO BALCONY
SINGLE SET OF STAIRS TO
LOCKER ROOM HALLWAY.
SNACK BAR / CONCESSION STAND FOR SWIMMING.  
CABINETS - STORAGE - SINK - REFRIGERATOR - ROOM !!! :)
THIS PHOTO TAKEN FROM SHALLOW END OF POOL.   8 STARTING BLOCKS IN - DIVING BOARD IN - AND YES
WATER / H20 IN POOL.  NEW RECORD BOARDS WILL GO IN CENTER RED 2 SPACES. THE GREY PANELS ARE
SOUND BAFFILING.  THE WHITE IN NEAR AREA OF POOL JUST LIGHT REFLECTION.
ON LEFT - LOOKING FROM SHALLOW END TO LEFT OF POOL &
SCORE BOARD.    ON RIGHT LOOKING FROM ENTRANCE TO POOL
DOWN THE BALCONY SIDE.
LOOKING FROM MID-POOL ON BALCONY SIDE
LOOKING FROM SHALLOW END TOWARD BALCONY SIDE.
SOME WERE WONDERING ABOUT WHAT TYPE OF GUTTER SYSTEM WE WOULD HAVE.  HOW
HARD FOR KIDS TO GET OUT.  IT IS BASICALLY A LEVEL ENTRY TO POOL.  ABOUT A 2 INCH LIP.